When the ground next to a house is flat or tilts toward the foundation, rain runs to the wall and soaks in beside it. This guide covers how much slope the code calls for, how swales and soil choice fit in, how to keep the new grade below the siding, and the utility markout rules in New York and New Jersey before any digging starts.

Updated Sep 21, 20268 min readLand Tech Enterprise LLC
Regrading a yard to slope away from the house

The slope target: 6 inches in the first 10 feet

The International Residential Code, section R401.3 Drainage, says the grade around a house shall fall a minimum of 6 inches within the first 10 feet from the foundation. That works out to about a 5 percent slope. It is the number building inspectors check on new construction, and it is the standard we regrade to on existing homes.

The code allows for tight lots. Where lot lines, walls, slopes, or other barriers make 6 inches of fall in 10 feet impossible, the grade must still slope away from the foundation at a minimum of 2 percent, and the water has to be directed to drains or swales that carry it away from the house. Impervious surfaces such as walks and patios within 10 feet of the foundation must slope at least 2 percent away from the building.

Many older houses in Rockland and Bergen no longer meet that standard, even if they did when they were built. The backfill around a foundation settles for years after construction, and the result is a shallow dip right along the wall. Mulch beds, pavers set at the wrong pitch, and years of topdressing the lawn can also flatten or reverse the slope.

Siding and foundation clearance

The easy way to get more slope is to pile soil against the house. That creates a new problem. The code, in IRC R317.1, requires wood siding, sheathing, and wall framing to be at least 6 inches above the ground unless it is rot-resistant or pressure-treated wood. The clearance to a concrete step, patio, or other hard surface is 2 inches. Soil against the siding holds moisture against the wall, invites insects, and can hide rot for years.

So the grade has two limits at the wall: it has to be at least 6 inches below the bottom of the siding, and it has to fall away from there. When the existing soil is already close to the siding, raising the grade at the house is not an option. The slope has to be made by lowering the ground farther out instead, cutting the yard down so the high point stays at the foundation and the grade drops toward the lawn.

We measure from the bottom of the siding and from any basement window sills before we plan the grade. Window wells, dryer vents, and hose bibs all set limits on how high the soil can come. Where a basement window sits too low for the grade to work, the window well needs its own drain.

Want this priced for your property?

We walk it with you, then send a written scope and a fixed price. Photos of the area help us come prepared.

Swales: moving the water after it leaves the house

A slope away from the foundation moves water out 10 feet. After that, the water still has to go somewhere. On most lots it collects between houses, along a fence line, or in a back corner. A swale is a shallow, wide channel shaped into the lawn to carry that water around the house and toward a lower spot, the street, or a wooded edge.

IRC R401.3 requires swales within 10 feet of the foundation to slope at least 2 percent. We keep swales broad and shallow, often 6 to 12 inches deep and several feet wide, so they can be mowed like the rest of the lawn. A steep narrow ditch erodes and is hard to maintain.

On the narrow side yards common in Pearl River, Nanuet, and much of Bergen, the swale usually runs between the two houses toward the street or the back of the lot. The water has to stay on your property until it reaches a legal outlet. In New York and New Jersey a landowner can be held liable for collecting water and sending it onto a neighbor's land, so a regrade that simply tilts the yard toward the neighbor's foundation is not a fix. Our yard drainage guide covers outlets in more detail.

Topsoil vs fill

Regrading usually moves soil more than it adds soil. Where fill is needed to build up low areas away from the house, the bulk of it should be clean fill or subsoil that compacts well. Clay fill is common in this area and works as a base because it sheds water, as long as it is placed in thin layers and compacted.

The top 4 to 6 inches should be screened topsoil, which is what the new lawn will grow in. Using topsoil for the whole fill depth is a mistake. Topsoil is loose and full of organic matter, and it settles and compresses much more than subsoil. A regrade built from 18 inches of topsoil can sink several inches in the first year and put the dip right back against the house.

Near the foundation, the finished surface should be topsoil with a denser layer under it so water runs off the surface instead of soaking straight down next to the wall. We do not use sand or loose stone as a fill against the foundation for surface grading, because it lets water drop straight down beside the basement.

Compaction and settling

Every lift of fill is compacted before the next one goes on. We place fill in layers about 4 to 6 inches thick and run a plate compactor or the tracks of the machine over each one. Soil that is too wet does not compact well and soil that is bone dry does not either, so timing the work around rain matters on clay.

Compaction needs a light touch near the foundation. Heavy equipment right against a basement wall can push on it, so the last few feet next to the house are compacted with a plate compactor or hand tamper. Away from the house, the goal is soil firm enough that it will not settle into dips over the first winter.

The topsoil layer is firmed but not compacted hard, because grass roots need loose soil. The final surface is checked with a laser level along several lines out from the house to confirm the fall. We would rather find a flat spot during grading than after the seed is down.

Seeding and protecting the new grade

Bare soil on a new slope erodes in the first hard rain. The grade needs grass or ground cover on it as soon as possible. Seeding works best from late August through September in this area, and again in spring. Sod can go down in most of the growing season and holds the soil right away, which makes it a good choice for swales and slopes steeper than a gentle lawn grade.

Seed on a slope should be covered with straw or an erosion control blanket so rain does not wash the seed and topsoil into the low end of the yard. Swales often get sod or a blanket even when the rest of the lawn is seeded, because they carry the most water. We handle seeding and sod as part of the same job.

The first few big storms are the test. Walk the yard during a heavy rain and watch where the water goes. A small low spot that shows up in the first season can be topdressed and reseeded. A larger one usually means fill settled and needs to be built back up.

Call 811 before any digging

In New York, 16 NYCRR 753-1.2 defines excavation to include grading and backfilling with mechanized equipment, so machine regrading counts even when it is only a few inches deep. It moves soil where gas, electric, water, cable, and irrigation lines can be buried. Service lines to a house are often shallower than people expect, and grading can cut them or leave them too close to the surface.

In New York, 16 NYCRR Part 753, section 753-3.1, requires notice to the one-call system at least two but not more than 10 working days before excavation starts, not counting the day of the call. The one-call center in New York is 811. In New Jersey, the law requires at least three business days of notice to New Jersey One Call through 811 before excavation.

The markout covers utility-owned lines. Private lines such as a lamp post feed, a line to a detached garage, a sprinkler system, or a propane line are usually not marked, and the owner should tell us where they are. We call in the markout on every grading job and wait for the marks before a machine touches the ground. More on how we handle grading is on our drainage and excavation page.

Questions

How much should a yard slope away from the house?

The International Residential Code, section R401.3, calls for at least 6 inches of fall in the first 10 feet from the foundation. Where the lot is too tight for that, the minimum is a 2 percent slope with water directed to a swale or drain.

How close to the siding can the soil be?

Keep soil at least 6 inches below wood siding and framing, per IRC R317.1. Against concrete steps and patios the clearance is 2 inches.

Can I regrade with topsoil only?

Not for deep fill. Use compacted fill or subsoil to build up the shape and finish with 4 to 6 inches of topsoil. Deep topsoil settles and brings the low spots back.

Do I need to call 811 to regrade my yard?

Yes. In New York, notice is required 2 to 10 working days before excavation under 16 NYCRR 753-3.1. In New Jersey it is at least 3 business days. Private lines are not marked and should be located separately.

When is the best time to regrade and seed?

Late summer to early fall is best for seeding in this area, with spring second. Grading itself can be done most of the year when the soil is not frozen or saturated.

Can regrading send water onto my neighbor's yard?

It should not. New York and New Jersey courts can hold a landowner liable for directing collected water onto a neighbor's property. A regrade needs an outlet on your own lot or an approved town connection.

Keep reading
Yard drainage in Rockland County

Yard drainage in Rockland County

Most wet yards in Rockland come down to clay soil, a bad grade, and roof water with nowhere to go.

6 min read
What drives paver patio cost

What drives paver patio cost

A paver patio is typically priced by the square foot and by the base work under it.

6 min read
Retaining wall permits and engineering

Retaining wall permits and engineering

In most New York and New Jersey towns, a retaining wall over 4 feet needs an engineered design and a permit, and walls under that limit can still need one if they hold up a driveway or a slope.

6 min read
Fence permits and property lines

Fence permits and property lines

A fence is one of the few projects where a few inches of placement can start a legal dispute.

6 min read
Planning an outdoor kitchen

Planning an outdoor kitchen

An outdoor kitchen is a permanent structure with gas, electric, and stone in it, so the planning is closer to a home addition than a patio.

6 min read
Hudson Valley seasonal yard checklist

Hudson Valley seasonal yard checklist

The lower Hudson Valley gets hard winters, wet springs, and a long leaf season, and a yard that is checked at the right times avoids most of the expensive repairs.

5 min read
Downspout drainage options: where roof water should go

Downspout drainage options: where roof water should go

Most wet basements and soggy foundation beds we look at in Rockland and Bergen start at a downspout that empties within a foot or two of the wall.

8 min read
Why a lawn stays wet after new sod or equipment work

Why a lawn stays wet after new sod or equipment work

A lawn that stays soft and wet for days after rain, weeks after new sod went down or a machine drove across it, usually has a problem under the grass, not in it.

7 min read
How a gravel shed pad base is built

How a gravel shed pad base is built

A shed lasts as long as the ground under it stays level and dry, and a gravel pad is the most common way to get that.

7 min read
Building a paver walkway and front steps

Building a paver walkway and front steps

A front walk and steps get more foot traffic and more winter salt than any other hardscape on the property.

8 min read
Retaining wall block vs stone: choosing a material for walls 4 feet and under

Retaining wall block vs stone: choosing a material for walls 4 feet and under

Most retaining walls on residential lots in Rockland and Bergen are under 4 feet tall, and at that height the choice of material comes down to looks, lifespan, and how the wall handles water and frost.

8 min read
Vinyl vs wood vs aluminum fence in Rockland and Bergen

Vinyl vs wood vs aluminum fence in Rockland and Bergen

The three most common residential fence materials here are wood, vinyl, and aluminum, and each one handles our freeze-thaw winters, wind, and clay soil differently.

8 min read
Low-voltage LED landscape lighting

Low-voltage LED landscape lighting

A low-voltage lighting system runs every fixture in the yard off one transformer that turns household current into 12 volts.

8 min read
How an estate cleanout works in Rockland County

How an estate cleanout works in Rockland County

An estate or whole-house cleanout goes fastest when the family sorts keepsakes and papers first and the crew clears everything else in one planned pass.

6 min read
How junk removal is priced

How junk removal is priced

Junk removal is priced mostly by how much space your items take up in the truck, with extra for heavy material, hard carries, and a short list of special items.

6 min read
Fall cleanup and town leaf pickup in Rockland and Bergen

Fall cleanup and town leaf pickup in Rockland and Bergen

A fall cleanup clears leaves and debris, puts beds to rest for winter, and sets the lawn up for spring.

6 min read
Mulch: how much you need and when to put it down

Mulch: how much you need and when to put it down

Mulch works best at 2 to 3 inches deep, kept off tree trunks and plant stems.

6 min read
Free estimate

Tell us about the project.

Three quick steps. We call you back to set up a free on-site estimate, usually the same day.

Step 1 of 3
What do you need? pick all that apply
CallTextFree estimate